Tumalo Irrigation District Group 3 Piping

Tumalo Irrigation District Group 3 Piping

The TID Group 3 Piping Project included installation of approximately 22,000 LF of HDPE pipeline ranging from 8-inch to 63-inch diameter, with welded side-saddle turnouts and delivery assemblies from 2-inch to 8-inch. Work also encompassed selective demolition, tree removal, trenching, earthwork, backfill, compaction, surface restoration, and coordination of utility locating and relocations as required.

Location:

Tumalo, Oregon

Owner:

Tumalo Irrigation District

YEAR COMPLETED:

2021